Hungry Jack’s Harrisdale

DSC03661

Project Description

Hungry Jack’s Harrisdale was a new build completed in June 2017 as part of the new Stockland Harrisdale Shopping Centre for the expanding suburb. The development consisted of a KFC, Hungry Jack’s, McDonalds, Aldi and other various tenancies. Our works completed included suspended ceilings, partition walls and external cladding.

Other new Hungry Jack’s stores and refurbishments completed by Hybrid Linings include Armadale, Banksia Grove, Beeliar, Cannington, Claremont, Cockburn Central, Dalyellup, Forrestdale, High Wycombe, Malaga and Midvale.

  • Ceilings
  • Supply and install 13mm flush plasterboard suspended with P50 cornice
  • Supply and install 6mm Versilux with 10mm express joints suspended and P50 cornice
  • Supply and install flush plasterboard bulkhead with 13mm plasterboard
  • Supply and install  600x600mm access panels
  • Allowance for R2.0 insulation
  • Walls
  • Supply and install internal linings of external stud walls – 9mm flush Villaboard direct fix to stud one side
  • Supply and install internal linings of internal stud walls – 9mm flush Villaboard direct fix to stud on both sides
  • Supply and install Glasswool R2.0 insulation batts to internal walls
  • Supply and install Glasswool R2.0 insulation batts to external walls
  • External Cladding
  • Supply and install 9mm Exotec direct fix to stud
  • Supply and install 9mm BGC Duragroove fixed to stud
  • Supply and install sarking
  • Other
  • Supply and install door frames
  • Install blue steel frame walls and trusses